1
LOI / MOULOI / MOU
engagement beginsसहभागाची सुरुवात
A non-binding Letter of Intent / Memorandum of Understanding. It opens the engagement, establishes the joint working group and data exchange, and carries no cost and no obligation for the community. Steps 1–5 are paper — typically 3–18 months in total.बंधनकारक नसलेले इरादापत्र / सामंजस्य करार. सहभाग आणि माहिती-देवाणघेवाण सुरू होते — खर्च नाही, बंधन नाही. पायऱ्या 1–5 कागदोपत्री — साधारण एकूण 3–18 महिने.
2
Term Sheetटर्म शीट
verification & termsपडताळणी आणि अटी
The verification phase. Feedstock streams, volumes, and the community’s disposal-cost basis (FWDC) are confirmed, the site is selected, and the per-tonne commercial terms are agreed before anything is signed long-term.पडताळणी टप्पा: कच्च्या मालाचे प्रवाह आणि प्रमाण, सध्याचा विल्हेवाट खर्च (FWDC), जागा आणि प्रति-टन व्यापारी अटी निश्चित होतात.
3
CSACSA
execution = T0स्वाक्षरी = T0
The Circular Supply Agreement — a minimum 30-year supply contract with perpetual continuation. Execution starts the project clock (T0). It locks the Beneficiation Fee, the Circular Royalty™, the feedstock commitment, and site access.सर्क्युलर सप्लाय अॅग्रीमेंट — किमान 30 वर्षांचा करार. स्वाक्षरीने प्रकल्प घड्याळ (T0) सुरू होते.
4
Underwritingहमीदारी
Carbotura-financedCarbotura वित्तपुरवठा
Carbotura arranges 100% of the facility financing under its Build-Own-Operate model. The community contributes zero capital and takes no construction or financing risk; an 18-month Parent Performance Guarantee backs all payment obligations.BOO मॉडेलखाली 100% वित्तपुरवठा Carbotura करते. सार्वजनिक भांडवल शून्य.
5
Permittingपरवानग्या
manufacturing basisउत्पादन आधार
The facility is permitted as manufacturing (NAICS 31–33), never as waste processing. Both parties commit to the Regulatory Predicate Transition — the endpoint is categorical: manufacturing classification across all permitting, licensing and regulatory contexts.सुविधेला उत्पादन सुविधा म्हणून परवानगी मिळते — कचरा प्रक्रिया म्हणून नाही.
6
Deploymentउभारणी
build · 12–18 monthsबांधकाम · 12–18 महिने
The facility is manufactured and deployed in standardized 100 TPD modular increments rather than built as one-off construction — a 12–18 month build from CSA execution to commissioning.सुविधा प्रमाणित 100 TPD मॉड्यूलमध्ये उभारली जाते — CSA स्वाक्षरीपासून कार्यान्वयनापर्यंत 12–18 महिन्यांचे बांधकाम.
7
COD & RoyaltiesCOD आणि रॉयल्टी
royalty +13mo after first feeपहिल्या शुल्कानंतर 13 महिन्यांनी रॉयल्टी
Commercial Operations Date: the facility begins accepting feedstock. The Beneficiation Fee applies to delivered tonnage, and the first Circular Royalty™ payment follows 13 months after the first fee payment, then monthly, escalating every year.व्यापारी कार्यारंभ दिनांक: सुविधा कच्चा माल स्वीकारू लागते. पहिली सर्क्युलर रॉयल्टी™ पहिल्या शुल्क भरण्यानंतर 13 महिन्यांनी मिळते.